The last big flood on the Ouachita River at Malvern a few weeks ago hit about 80,000 cfs and further scoured the entrance to the swiftwater rescue training channel. These photos show a newly uncovered section of the cribbing dam built in the late 1800s, as described in the 404 Permit research done by the Highway Department for the new Tanner Street Bridge project. It looks like the channel has been getting deeper and washing away logs from the formerly buried dam ever since the bridge contractor accidentally dug up part of the cribbing.
LOOKING DOWNSTREAM, ALONG WEST BANK
LOOKING UPSTREAM, ALONG WEST BANK
LOGS STUB OUT FROM THE BANK, MORE LOGS RUN PARALLEL TO THE FLOW OR WERE WASHED INTO THAT POSITION
THERE IS A SECOND LOG JUST UNDER THE WATER SURFACE, ABOUT 4 FEET CLOSER TO THE BANK; THAT SUGGESTS THE LOGS WERE LAID PARALLEL TO THE FLOW
Mike Coogan, alias Captain Aleve