Page 1 of 1

Rockport Release Email

Posted: Thu Sep 10, 2009 1:37 pm
by Renee H
-- Flow Release Plans --

The Corps is releasing about 2700 CFS from Blakely Mountain Dam from about 7 AM to 11 PM.

Carpenter Dam will release about 3,700 CFS from about Noon AM to 10 PM.

Remmel Dam will release about 3,600 CFS from 11 AM to 8 PM with a flow of over 200 CFS the rest of the time.

On Saturday and Sunday, September 19-20 the flow release from Blakely will occur from about 5 AM to 8 PM. Carpenter Dam will release about 3700 CFS from about 7 AM to 5 PM. Remmel Dam will release about 3,600 CFS from about 6 AM to 3 PM.



On Monday, September 21, we will begin low flow operations. The release from Remmel will be just above 200 CFS, Carpenter will release for a few hours every other day or as needed to maintain lake levels. Blakely will release a few hundred CFS from the flood tunnel for a few days and then switch to periodic generation releases.



The Corps will be releasing about 150 CFS from the DeGray re-regulation pool and will release from the dam every other day or so as needed to maintain the re-reg pool.

(You can hear this message recorded at 501-844-2125.)

For more flow release information, contact: Ted Smethers, tsmethe@entergy.com or (501) 844-2162.